Ases Kahraba

    Electrical Installation Costs Egypt 2026: A Realistic Pricing Guide

    Proper financial planning for your electrical project saves you from costly surprises. This guide presents updated realistic prices for 2026 to help you set an accurate budget before starting any electrical work in Egypt.

    By the Ases Kahraba team — Last updated: February 2026

    Quick Answer

    100m² apartment: electrical wiring 10,800–16,800 EGP labor only. 300m² villa from 27,000 EGP. Real 2026 prices from licensed Egyptian electricians — not estimates.

    Electrical Foundation Tiers for 100m² Apartment (Labor Only)

    Materials — cables, conduits, panel — are added on top of the labor price

    Bronze

    9,000

    EGP labor

    80 pts • 24-way panel • 2 protections • 1 dimmer • 4 shower/phone pts

    Silver

    11,000

    EGP labor

    100 pts • 36-way + comms panel • 3 dimmers • 4 network pts • smart prep • door cam

    Platinum

    14,000

    EGP labor

    150 pts • 36-way + comms panel • 5 dimmers • 8 network pts • shutter • door cam • intercom

    Villa 300m² — for comparison

    27,000

    Bronze

    33,000

    Silver

    42,000

    Platinum

    Labor only — EGP

    أسس كهرباaseskahraba.com

    ← Full cost guide for a 100m² apartment (labour + materials + point count table)

    Common Electrical Work Prices in Egypt 2026

    • Electrical rough-in labor cost for a 100m² apartment (labor only — materials quoted separately): EGP 9,000 (Bronze), EGP 11,000 (Silver), or EGP 14,000 (Platinum). Materials — cables, conduits, panel — are added on top.
    • Electrical rough-in labor cost for a 150m² apartment (labor only — materials quoted separately): EGP 13,500 (Bronze), EGP 16,500 (Silver), or EGP 21,000 (Platinum). Materials (cables, conduits, panel) are quoted separately and typically add EGP 8,000–18,000 depending on cable quality.
    • Electrical finishing labor for a 100 m² apartment (labor only): EGP 4,000–8,000 depending on point count. Switches, sockets, and the distribution panel are priced separately by brand.
    • Foundation wiring labor for a 300 m² villa (labor only): EGP 27,000 (Bronze 90/m²), EGP 33,000 (Silver), or EGP 42,000 (Platinum 140/m²). Higher with additional floors and outdoor areas.
    • Replacing an old distribution panel with new circuit breakers and organized wiring: costs between EGP 3,000 and 8,000 depending on panel size and number of circuits.
    • Dedicated AC line for a single unit (dedicated cable and breaker): ranges from EGP 400 to 900 per unit, increasing for long or difficult cable runs.
    • Adding a new socket in the same room (short cable run): labor and materials typically cost EGP 200 to 600 per socket depending on type and distance.
    • Comprehensive home electrical inspection with written report and recommendations: service ranges from EGP 300 to 700 — a smart investment that protects against costly future faults.

    Calculate your project cost in seconds

    Enter your area and tier — instant labor cost estimate

    Calculator →

    Got an Electrical Problem?

    Send a photo on WhatsApp and we'll reply within minutes with a diagnosis and quote.

    +20 100 411 1999

    Frequently Asked Questions

    Why do prices vary so much between different quotes?

    Prices are affected by cable and materials quality, team experience level, warranty terms, and geographic location. A very low price usually signals substandard materials or untrained labor, which costs you more in the long run through repairs and rework.


    How do I get an accurate quote for my project?

    Ask the electrician to visit the site before quoting, and insist on a detailed written quote specifying cable quantities, conduit types, material brands, number of points, and working days. A verbal quote offers no protection if a dispute arises.


    What does a typical rough-in electrical quote include?

    Rough-in typically includes main and branch cables, plastic or metal conduits, flush-mounted socket and switch boxes, and the distribution panel with breakers. It usually does not include civil works such as concrete cutting or patching.


    Are there hidden costs I should watch for?

    Yes — common hidden costs include: wall cutting and patching (a separate civil cost), upgrading the distribution panel if the old one cannot handle new loads, and the earthing system, which is frequently omitted from initial quotes but is essential for safety.


    Can I pay in installments?

    Yes. Professional contractors accept stage payments tied to progress: a deposit at contract signing (20–30%), a payment when rough-in is complete, and the balance at final delivery after network testing. Avoid paying the full amount upfront.


    What do rough-in electrical materials cost in Egypt 2026?

    Approximate materials cost for a 100m² apartment (March 2026): El-Sewedy 2.5mm² copper cable ×200m ≈ EGP 2,400–3,000 — 1.5mm² ×100m ≈ EGP 900–1,200 — AC 6mm² cable ×20m per unit ≈ EGP 400–600/unit — PVC conduits + flush boxes ≈ EGP 1,500–2,500 — Schneider 12-slot panel + breakers ≈ EGP 2,500–4,500. Estimated total materials for the apartment: EGP 10,000–15,000 excluding finishing electrical items.