Generator and ATS Integration in Egypt & Cairo
We integrate utility and generator sources via ATS with safe critical-load separation and backfeed prevention.
Why Ases Kahraba
Critical and non-critical load separation
ATS integration aligned with safety standards
Live transfer and operation testing
Clear operation and maintenance plan
Problems We Solve
Complete power outage during utility cut with no connected generator
Having to start the generator manually every time with risk of connection error
Generator exists but no ATS so transfer takes time and is done incorrectly
Backfeed into the public grid is dangerous for neighbors and utility workers
How We Work
Step 1
Required load audit
Step 2
ATS integration design
Step 3
Installation and source wiring
Step 4
Transfer testing and handover
Materials We Use
Perkins, Cummins, or Mitsubishi generator per budget
ATS panel from Schneider, ABB, or certified local manufacturer
Large-section feeder cables appropriate for generator load
Main isolator preventing backfeed to the grid
AMF automatic smart control unit for automatic startup
Service FAQ
