Ases Kahraba

    Apartment Electrical Installation in Egypt & Cairo

    We execute apartment electrical infrastructure from the first point to final board according to code, with proper load distribution and pre-handover testing.

    Why Ases Kahraba

    Certified engineering design based on actual loads

    Code-compliant execution and safety standards

    Insulation, continuity, and operation testing before handover

    Final technical report + up to 5-year warranty

    Problems We Solve

    Breakers tripping frequently when running AC or washing machine

    Voltage drops during peak hours

    Exposed wires or disorganized wiring from a previous contractor

    Distribution panel with no labeled or documented circuits

    Approximate Pricing

    The following prices are estimates and vary by area, points count, location, and material grade.

    Apartment foundation 100-150m

    From EGP 18,000 to EGP 38,000

    Distribution board + protections

    From EGP 6,500 to EGP 16,000

    Testing and final report

    From EGP 2,000 to EGP 6,000

    Project Samples (Before / After)

    135m Apartment - New Cairo

    Before Photo
    After Photo

    Before

    Before: random wiring without labeling

    After

    After: organized load distribution and documented board

    160m Apartment - Nasr City

    Before Photo
    After Photo

    Before

    Before: weak kitchen and AC circuits

    After

    After: separated circuits and improved safety

    Client Testimonials

    "The team wired our apartment very professionally and every point was done correctly the first time. The technical report was clear and gave me full confidence in the work."

    Ahmed Mohamed

    Fifth Settlement, Cairo

    "Reasonable prices and clean work, the breakers have not tripped once since handover. I strongly recommend them for any wiring project."

    Nour El Din Ibrahim

    Nasr City, Cairo

    "They handled the infrastructure when the apartment was still raw and came back for finishing. Each time the execution was organized and hassle-free."

    Sara Ali

    Rehab City, Cairo

    How We Work

    Step 1

    Site inspection and requirement capture

    Step 2

    Path planning and load distribution

    Step 3

    Execution, labeling, and testing

    Step 4

    Handover with report and warranty

    Materials We Use
    El Sewedy certified electrical cables
    Schneider Electric or LS Electric breakers
    PVC or metallic conduit based on finish type
    Legrand or certified-equivalent installation accessories
    Certified enclosures with code-compliant protections
    Service FAQ

    Ready to start your apartment wiring?

    Book an inspection now or message us on WhatsApp for a quick quote.

    Other Services